Open Access iconOpen Access

ARTICLE

Landslide control in the excavation of a shallowly buried tunnel with a large front slope

Haotian Ma1, Wanli Qin1, Bingyi Zhang2, Zhenxing Wang3, Wanli Qin4

1 Huadong Engineering Corporation Limited, Hangzhou 311122, China
2 Yongwei Real Estate Group Corporation Limited, Zhengzhou 450000, China
3 China Three Gorges Corporation, Wuhan 430010, China
4 Huadong Engineering Corporation Limited

* Corresponding Authors: Haotian Ma (email), Wanli Qin (email" />), Bingyi Zhang (email), Zhenxing Wang (email), Wanli Qin (email" />)

TSP_RIMNI_13.pdf

  • 28

    View

  • 20

    Download

  • 0

    Like

Share Link