Open Access iconOpen Access

ARTICLE

Landslide control in the excavation of a shallowly buried tunnel with a large front slope

Haotian Ma1, Wanli Qin1, Bingyi Zhang2, Zhenxing Wang3

1 Huadong Engineering Corporation Limited, Hangzhou 311122, China
2 Yongwei Real Estate Group Corporation Limited, Zhengzhou 450000, China
3 China Three Gorges Corporation, Wuhan 430010, China

* Corresponding Authors: Haotian Ma (email), Wanli Qin (email), Bingyi Zhang (email), Zhenxing Wang (email)

TSP_RIMNI_13.pdf

  • 88

    View

  • 72

    Download

  • 0

    Like

Share Link