Guosheng Li1, Qingquan Lv2, Zhenzhen Zhang2, Haiying Dong1,*
Energy Engineering, Vol.120, No.4, pp. 1045-1065, 2023, DOI:10.32604/ee.2023.023770
- 13 February 2023
Abstract Aiming at the problems of output voltage fluctuation and current total harmonic distortion (THD) in the front stage totem-pole bridgeless PFC of two-stage V2G (Vehicle to Grid) vehicle-mounted bi-directional converter, a fuzzy linear active disturbance rejection control strategy for V2G front-stage AC-DC power conversion system is proposed. Firstly, the topological working mode of the totem-pole bridgeless PFC is analyzed, and the mathematical model is established. Combined with the system model and the linear active disturbance rejection theory, a double closed-loop controller is designed with the second-order linear active disturbance rejection control as the voltage outer More >
Graphic Abstract