Home / Advanced Search

  • Title/Keywords

  • Author/Affliations

  • Journal

  • Article Type

  • Start Year

  • End Year

Update SearchingClear
  • Articles
  • Online
Search Results (2)
  • Open Access

    ARTICLE

    Effect of CSH Crystal Nucleus on Steam-Free Cured Fly Ash Precast Concrete Components

    Ruyi Luo, Yanyan Hu*, Tingshu He*, Xiaodong Ma, Yongdong Xu

    Journal of Renewable Materials, Vol.11, No.9, pp. 3485-3500, 2023, DOI:10.32604/jrm.2023.027592 - 20 July 2023

    Abstract The measures of steam curing and early-strengthening agents to promote the precast components to reach the target strength quickly can bring different degrees of damage to the concrete. Based on this, the new nanomaterial CSH-the hydration product of cement effectively solves these measures’ disadvantages, such as excessive energy consumption, thermal stress damage, and the introduction of external ions. In this paper, the effect of CSH on the early strength of precast fly ash concrete components was investigated in terms of setting time, workability, and mechanical properties and analyzed at the microscopic level using hydration temperature, More >

  • Open Access

    ARTICLE

    Dynamic Production Scheduling for Prefabricated Components Considering the Demand Fluctuation

    Juan Du1,*, Peng Dong2, Vijayan Sugumaran3

    Intelligent Automation & Soft Computing, Vol.26, No.4, pp. 715-723, 2020, DOI:10.32604/iasc.2020.010105

    Abstract A dynamic optimized production scheduling which takes into account demand fluctuation and uncertainty is very critical for the efficient performance of Prefabricated Component Supply Chain. Previous studies consider only the conditions in the production factory and develop corresponding models, ignoring the dynamic demand fluctuation that often occurs at the construction site and its impact on the entire lifecycle of prefabricated construction project. This paper proposes a dynamic flow shop scheduling model for prefabricated components production, which incorporates demand fluctuation such as the advance of due date, insertion of urgent component and order cancellation. An actual More >

Displaying 1-10 on page 1 of 2. Per Page