Home / Advanced Search

  • Title/Keywords

  • Author/Affliations

  • Journal

  • Article Type

  • Start Year

  • End Year

Update SearchingClear
  • Articles
  • Online
Search Results (2)
  • Open Access

    ARTICLE

    Dynamical Artificial Bee Colony for Energy-Efficient Unrelated Parallel Machine Scheduling with Additional Resources and Maintenance

    Yizhuo Zhu1, Shaosi He2, Deming Lei2,*

    CMC-Computers, Materials & Continua, Vol.81, No.1, pp. 843-866, 2024, DOI:10.32604/cmc.2024.054473 - 15 October 2024

    Abstract Unrelated parallel machine scheduling problem (UPMSP) is a typical scheduling one and UPMSP with various real-life constraints such as additional resources has been widely studied; however, UPMSP with additional resources, maintenance, and energy-related objectives is seldom investigated. The Artificial Bee Colony (ABC) algorithm has been successfully applied to various production scheduling problems and demonstrates potential search advantages in solving UPMSP with additional resources, among other factors. In this study, an energy-efficient UPMSP with additional resources and maintenance is considered. A dynamical artificial bee colony (DABC) algorithm is presented to minimize makespan and total energy consumption… More >

  • Open Access

    ARTICLE

    Scheduling an Energy-Aware Parallel Machine System with Deteriorating and Learning Effects Considering Multiple Optimization Objectives and Stochastic Processing Time

    Lei Wang1,2,*, Yuxin Qi1,2

    CMES-Computer Modeling in Engineering & Sciences, Vol.135, No.1, pp. 325-339, 2023, DOI:10.32604/cmes.2022.019730 - 29 September 2022

    Abstract Currently, energy conservation draws wide attention in industrial manufacturing systems. In recent years, many studies have aimed at saving energy consumption in the process of manufacturing and scheduling is regarded as an effective approach. This paper puts forwards a multi-objective stochastic parallel machine scheduling problem with the consideration of deteriorating and learning effects. In it, the real processing time of jobs is calculated by using their processing speed and normal processing time. To describe this problem in a mathematical way, a multi-objective stochastic programming model aiming at realizing makespan and energy consumption minimization is formulated. More >

Displaying 1-10 on page 1 of 2. Per Page