Junhui Li1, Yuqing Zhang1, Can Chen2, Xiaoxiao Wang2, Yinchi Shao2, Xingxu Zhu1, Cuiping Li1,*
Energy Engineering, Vol.121, No.9, pp. 2389-2408, 2024, DOI:10.32604/ee.2024.050239
- 19 August 2024
Abstract Aiming at the consumption problems caused by the high proportion of renewable energy being connected to the
distribution network, it also aims to improve the power supply reliability of the power system and reduce the
operating costs of the power system. This paper proposes a two-stage planning method for distributed
generation and energy storage systems that considers the hierarchical partitioning of source-storage-load.
Firstly, an electrical distance structural index that comprehensively considers active power output and reactive
power output is proposed to divide the distributed generation voltage regulation domain and determine the
access location and number… More >