Jun Zhao*, Chaoying Yang, Ran Li, Jinge Song
Energy Engineering, Vol.121, No.3, pp. 747-767, 2024, DOI:10.32604/ee.2023.042806
- 27 February 2024
Abstract Due to the impact of source-load prediction power errors and uncertainties, the actual operation of the park will have a wide range of fluctuations compared with the expected state, resulting in its inability to achieve the expected economy. This paper constructs an operating simulation model of the park power grid operation considering demand response and proposes a multi-time scale operating simulation method that combines day-ahead optimization and model predictive control (MPC). In the day-ahead stage, an operating simulation plan that comprehensively considers the user’s side comfort and operating costs is proposed with a long-term time More >