Rong Wang1, Xinxin Xu2, Zijia Wang3,*, Fei Ji1, Nankun Mu4
CMC-Computers, Materials & Continua, Vol.80, No.2, pp. 2363-2385, 2024, DOI:10.32604/cmc.2024.053564
- 15 August 2024
Abstract Marine container terminal (MCT) plays a key role in the marine intelligent transportation system and international logistics system. However, the efficiency of resource scheduling significantly influences the operation performance of MCT. To solve the practical resource scheduling problem (RSP) in MCT efficiently, this paper has contributions to both the problem model and the algorithm design. Firstly, in the problem model, different from most of the existing studies that only consider scheduling part of the resources in MCT, we propose a unified mathematical model for formulating an integrated RSP. The new integrated RSP model allocates and… More >