Xianghua Liu1, Hai Song1, Lu Zhao1, Yan Zheng1, Neng Yang2, Dongling Qiu2,*
FDMP-Fluid Dynamics & Materials Processing, Vol.20, No.10, pp. 2377-2392, 2024, DOI:10.32604/fdmp.2024.051418
- 23 September 2024
Abstract The segmented water control technology for bottom water reservoirs can effectively delay the entry of bottom water and adjust the production profile. To clarify the impact of different methods on horizontal well production with different reservoir conditions and to provide theoretical support for the scientific selection of methods for bottom water reservoirs, a numerical simulation method is presented in this study, which is able to deal with wellbore reservoir coupling under screen tube, perforation, and ICD (Inflow Control Device) completion. Assuming the geological characteristics of the bottom-water conglomerate reservoir in the Triassic Formation of the… More >