Home / Advanced Search

  • Title/Keywords

  • Author/Affliations

  • Journal

  • Article Type

  • Start Year

  • End Year

Update SearchingClear
  • Articles
  • Online
Search Results (2)
  • Open Access

    ARTICLE

    Improved STN Models and Heuristic Rules for Cooperative Scheduling in Automated Container Terminals

    Hongyan Xia, Jin Zhu*

    CMES-Computer Modeling in Engineering & Sciences, Vol.138, No.2, pp. 1637-1661, 2024, DOI:10.32604/cmes.2023.029576 - 17 November 2023

    Abstract Improving the cooperative scheduling efficiency of equipment is the key for automated container terminals to cope with the development trend of large-scale ships. In order to improve the solution efficiency of the existing space-time network (STN) model for the cooperative scheduling problem of yard cranes (YCs) and automated guided vehicles (AGVs) and extend its application scenarios, two improved STN models are proposed. The flow balance constraints in the original model are decomposed, and the trajectory constraints of YCs and AGVs are added to acquire the model STN_A. The coupling constraint in STN_A is updated, and… More >

  • Open Access

    ARTICLE

    Scheduling Multi-Mode Resource-Constrained Projects Using Heuristic Rules Under Uncertainty Environment

    Mohamed Abdel-Basset1, Ahmed Sleem1, Asmaa Atef1, Yunyoung Nam2,*, Mohamed Abouhawwash3,4

    CMC-Computers, Materials & Continua, Vol.70, No.1, pp. 847-874, 2022, DOI:10.32604/cmc.2022.017106 - 07 September 2021

    Abstract Project scheduling is a key objective of many models and is the proposed method for project planning and management. Project scheduling problems depend on precedence relationships and resource constraints, in addition to some other limitations for achieving a subset of goals. Project scheduling problems are dependent on many limitations, including limitations of precedence relationships, resource constraints, and some other limitations for achieving a subset of goals. Deterministic project scheduling models consider all information about the scheduling problem such as activity durations and precedence relationships information resources available and required, which are known and stable during… More >

Displaying 1-10 on page 1 of 2. Per Page