Dan Wu1, Yanbo Che1, Wei Li2,*, Wei He3, Dongyi Li4
Energy Engineering, Vol.118, No.5, pp. 1549-1564, 2021, DOI:10.32604/EE.2021.014818
- 16 July 2021
Abstract With the significant progress of the “coal to electricity” project, the electric kiln equipment began to be connected
to the distribution network on a large scale, which caused power quality problems such as low voltage, high harmonic distortion rate, and high reactive power loss. This paper proposes a two-stage power grid comprehensive
resource optimization configuration model. A multi-objective optimization solution based on the joint simulation
platform of Matlab and OpenDSS is developed. The solution aims to control harmonics and optimize reactive
power. In the first stage, a multi-objective optimization model is established to minimize the… More >