Home / Advanced Search

  • Title/Keywords

  • Author/Affliations

  • Journal

  • Article Type

  • Start Year

  • End Year

Update SearchingClear
  • Articles
  • Online
Search Results (2)
  • Open Access

    ARTICLE

    Optimization of the Plugging Agent Dosage for High Temperature Salt Profile Control in Heavy Oil Reservoirs

    Jiayu Ruan1, Mingjing Lu2,3, Wei Zhang4, Yuxi Zhang1, Yuhui Zhou1,*, Jie Gong1, Fan Wang1, Yuanxiao Guan1

    FDMP-Fluid Dynamics & Materials Processing, Vol.19, No.2, pp. 421-436, 2023, DOI:10.32604/fdmp.2022.020665 - 29 August 2022

    Abstract After steam discharge in heavy oil reservoirs, the distribution of temperature, pressure, and permeability in different wells becomes irregular. Flow channels can easily be produced, which affect the sweep efficiency of the oil displacement. Previous studies have shown that the salting-out plugging method can effectively block these channels in high-temperature reservoirs, improve the suction profile, and increase oil production. In the present study, the optimal dosage of the plugging agent is determined taking into account connection transmissibility and inter-well volumes. Together with the connectivity model, a water flooding simulation model is introduced. Moreover, a non-gradient More >

  • Open Access

    ARTICLE

    A Model for the Connectivity of Horizontal Wells in Water-Flooding Oil Reservoirs

    Chenyang Shi1,2,3, Fankun Meng1,2,3,*, Hongyou Zhang4, HuiJiang Chang4, Xun Zhong1,2,3, Jie Gong1,2,3, Fengling Li5

    FDMP-Fluid Dynamics & Materials Processing, Vol.18, No.5, pp. 1441-1468, 2022, DOI:10.32604/fdmp.2022.019788 - 27 May 2022

    Abstract As current calculation models for inter-well connectivity in oilfields can only account for vertical wells, an updated model is elaborated here that can predict the future production performance and evaluate the connectivity of horizontal wells (or horizontal and vertical wells). In this model, the injection-production system of the considered reservoir is simplified and represented with many connected units. Moreover, the horizontal well is modeled with multiple connected wells without considering the pressure loss in the horizontal direction. With this approach, the production performance for both injection and production wells can be obtained by calculating the… More >

Displaying 1-10 on page 1 of 2. Per Page