Home / Advanced Search

  • Title/Keywords

  • Author/Affliations

  • Journal

  • Article Type

  • Start Year

  • End Year

Update SearchingClear
  • Articles
  • Online
Search Results (2)
  • Open Access

    ARTICLE

    Adaptive Boundary and Semantic Composite Segmentation Method for Individual Objects in Aerial Images

    Ying Li1,2, Guanghong Gong1, Dan Wang1, Ni Li1,3,*

    CMES-Computer Modeling in Engineering & Sciences, Vol.136, No.3, pp. 2237-2265, 2023, DOI:10.32604/cmes.2023.025193 - 09 March 2023

    Abstract There are two types of methods for image segmentation. One is traditional image processing methods, which are sensitive to details and boundaries, yet fail to recognize semantic information. The other is deep learning methods, which can locate and identify different objects, but boundary identifications are not accurate enough. Both of them cannot generate entire segmentation information. In order to obtain accurate edge detection and semantic information, an Adaptive Boundary and Semantic Composite Segmentation method (ABSCS) is proposed. This method can precisely semantic segment individual objects in large-size aerial images with limited GPU performances. It includes… More > Graphic Abstract

    Adaptive Boundary and Semantic Composite Segmentation Method for Individual Objects in Aerial Images

  • Open Access

    ARTICLE

    Dynamic Risk-Warning of Center Diaphragm and Bench Composite Method During Construction

    Xiaozhong Li*, Caiyun Sun

    Structural Durability & Health Monitoring, Vol.16, No.3, pp. 235-254, 2022, DOI:10.32604/sdhm.2022.013141 - 18 July 2022

    Abstract During the construction of subway tunnels, safety issues should not be ignored, so it is necessary to prevent and resolve the risk in time and accurately. However, there are some shortcomings in the research of risk assessment, such as the subjectivity of initial data or the lack of scientific evaluation model, in order to solve the problem, this paper relies on the Changping section of the Guanhui Intercity Metro, in order to establish a dynamic risk-warning model for the construction process of subway tunnel with the CD-Bench composite method. First, a monitoring plan was equationted… More >

Displaying 1-10 on page 1 of 2. Per Page