Home / Advanced Search

  • Title/Keywords

  • Author/Affliations

  • Journal

  • Article Type

  • Start Year

  • End Year

Update SearchingClear
  • Articles
  • Online
Search Results (2)
  • Open Access

    ARTICLE

    Distribution Network Equipment Location and Capacity Planning Method Considering Energy Internet Attribute from the Perspective of Life Cycle Cost

    Qiang Li1,*, Lei Xue1, Xia Lin2

    Energy Engineering, Vol.119, No.3, pp. 1059-1074, 2022, DOI:10.32604/ee.2022.017687 - 31 March 2022

    Abstract For facing the challenges brought by large-scale renewable energy having access to the system and considering the key technologies of energy Internet, it is very necessary to put forward the location method of distribution network equipment and capacity from the perspective of life cycle cost. Compared with the traditional energy network, the equipment capacity problem of energy interconnected distribution network which involves in electricity network, thermal energy network and natural gas network is comprehensively considered in this paper. On this basis, firstly, the operation architecture of energy interconnected distribution network is designed. Secondly, taking the… More >

  • Open Access

    ARTICLE

    Research on Operation of Electrothermal Integrated Energy System Including Heat Pump and Thermal Storage Units Based on Capacity Planning

    Taihong Liu1, Dingchen Wu2,*, Fei Xu3, Panpan Song2, Mingshan Wei2, Jian Wu1, Xiaochun Bai1

    Energy Engineering, Vol.118, No.3, pp. 535-548, 2021, DOI:10.32604/EE.2021.014326 - 22 March 2021

    Abstract In view of the Three North areas existing wind power absorption and environment pollution problems, the previous scholars have improved the wind abandon problem by adding electrothermal coupling equipment or optimizing power grid operation. In this paper, an electrothermal integrated energy system including heat pump and thermal storage units was proposed. The scheduling model was based on the load data and the output characteristics of power units, each power unit capacity was programmed without constraints, and the proposed scheduling model was compared with the traditional combined heat and power scheduling model. Results showed that the More >

Displaying 1-10 on page 1 of 2. Per Page