Hong Pang1, Ao Lu1, Ming Xiong1, Chen Chen1, Xian Cao1, Xiong Xu2,3,*, Jing Wang1
FDMP-Fluid Dynamics & Materials Processing, Vol.20, No.5, pp. 1063-1074, 2024, DOI:10.32604/fdmp.2023.044000
- 07 June 2024
Abstract Conventional repairing methods for asphalt pavement have some inconveniences, such as insufficient strength, and are typically time-consuming. To address these issues, this study proposes a new technological method to design and prepare a high-performance assembled asphalt concrete block for fast repair of the potholes. A series of composite modified asphalt binders with 10% crumb rubber (CR) and different dosages (0%, 1%, 3%, 5%) of polyurethane (PU) are examined to determine the optimized binder. Subsequently, the corresponding asphalt mixtures are prepared for further comparison and assessment of engineering properties, such as moisture-induced damage, high-temperature deformation, and More >