Deng Lu1, Xujun Lang1, Bo Yang1, Ziyang Li1, Hang Geng2,*
Energy Engineering, Vol.120, No.10, pp. 2287-2306, 2023, DOI:10.32604/ee.2023.029140
- 28 September 2023
Abstract The four-circuit parallel line on the same tower effectively solves the problems faced by the line reconstruction and construction under the condition of the increasing shortage of transmission corridors. Optimizing the conductor and phase sequence arrangement of multiple transmission lines is conducive to improving electromagnetic and electrostatic coupling caused by electromagnetic problems. This paper uses the ATP-EMTP simulation software to build a 500 kV multi-circuit transmission line on the same tower. It stimulates the induced voltage and current values of different line lengths, tower spacing, vertical and horizontal spacing between different circuits, phase sequence arrangement,… More >