Peixian Li1,*, Zhixiang Tan2, Lili Yan3
CMES-Computer Modeling in Engineering & Sciences, Vol.117, No.2, pp. 231-250, 2018, DOI:10.31614/cmes.2018.02573
Abstract In order to prolong the life cycle of the coal mine, Jinggezhuang (‘JGZ’) coal mine decided to excavate the shaft pillar. The first panel 0091 was designed near the pillar boundary as an experiment in shaft pillar mining. Both probability integral method (PIM) and FLAC3D were used to evaluate the influence on the shaft safety. PIM parameters were obtained from previous surface subsidence station. The rock property is based on the lab mechanical test. A simulated FLAC3D model containing shafts and a panel was built based on stratigraphic information. Surface subsidence results of PIM show that… More >