Ignatius Riyadi Mardiyanto1, Jangkung Raharjo2,*, Sri Utami1, Wahyu Budi Mursanto1, Agoeng Hardjatmo Rahardjo1
Energy Engineering, Vol.120, No.6, pp. 1295-1305, 2023, DOI:10.32604/ee.2023.027756
- 03 April 2023
Abstract Utilization of Micro Hydro Power Plant at the Gunung Halu case study type run-off the river is a household use only in the afternoon, around 5 pm until bedtime at about 10 pm. Therefore, more than 75% of the energy is lost. This case study lost power which can be used as a by-product, such as for drying coffee beans. In this case study, a design was carried out to obtain by-products and improve power quality in the electrical system. In addition, they complain about the poor quality of power controlled by frequency using Triac-Based More >
Graphic Abstract