Home / Advanced Search

  • Title/Keywords

  • Author/Affliations

  • Journal

  • Article Type

  • Start Year

  • End Year

Update SearchingClear
  • Articles
  • Online
Search Results (2)
  • Open Access

    ARTICLE

    Memory-Type Control Charts Through the Lens of Cost Parameters

    Sakthiseswari Ganasan1, You Huay Woon2,*, Zainol Mustafa1, Dadasaheb G. Godase3

    Intelligent Automation & Soft Computing, Vol.36, No.1, pp. 1-10, 2023, DOI:10.32604/iasc.2023.032062 - 29 September 2022

    Abstract A memory-type control chart utilizes previous information for chart construction. An example of a memory-type chart is an exponentially-weighted moving average (EWMA) control chart. The EWMA control chart is well-known and widely employed by practitioners for monitoring small and moderate process mean shifts. Meanwhile, the EWMA median chart is robust against outliers. In light of this, the economic model of the EWMA and EWMA median control charts are commonly considered. This study aims to investigate the effect of cost parameters on the out-of-control average run length in implementing EWMA and EWMA median control charts. The… More >

  • Open Access

    ARTICLE

    Fractional Order Environmental and Economic Model Investigations Using Artificial Neural Network

    Wajaree Weera1, Chantapish Zamart1, Zulqurnain Sabir2,3, Muhammad Asif Zahoor Raja4, Afaf S. Alwabli5, S. R. Mahmoud6, Supreecha Wongaree7, Thongchai Botmart1,*

    CMC-Computers, Materials & Continua, Vol.74, No.1, pp. 1735-1748, 2023, DOI:10.32604/cmc.2023.032950 - 22 September 2022

    Abstract The motive of these investigations is to provide the importance and significance of the fractional order (FO) derivatives in the nonlinear environmental and economic (NEE) model, i.e., FO-NEE model. The dynamics of the NEE model achieves more precise by using the form of the FO derivative. The investigations through the non-integer and nonlinear mathematical form to define the FO-NEE model are also provided in this study. The composition of the FO-NEE model is classified into three classes, execution cost of control, system competence of industrial elements and a new diagnostics technical exclusion cost. The mathematical… More >

Displaying 1-10 on page 1 of 2. Per Page