G. Bertrand1
Structural Durability & Health Monitoring, Vol.1, No.3, pp. 185-192, 2005, DOI:10.3970/sdhm.2005.001.185
Abstract Each maintenance strategy demands for the definition of an inspection threshold and further inspection intervals. A general criterion for the calculation of the time to first inspection is high probability of detection of a certain crack size and low failure probability in case a predicted crack size was not detected. The proposed method demonstrates that a top down analysis of crack development from critical sizes to detectable sizes reveals an economic benefit with respect to the frequency of inspections. The dispersion of fatigue stress cycles at rupture obtained from component tests at riveted lap joints More >