Open Access iconOpen Access

ARTICLE

crossmark

Optimal Location and Sizing of Multi-Resource Distributed Generator Based on Multi-Objective Artificial Bee Colony Algorithm

Qiangfei Cao1, Huilai Wang2, Zijia Hui1, Lingyun Chen2,*

1 Economic and Technological Research Institute, State Grid Shanxi Electric Power Co., Ltd., Xi’an, 710075, China
2 Central Southern China Electric Power Design Institute Co., Ltd., China Power Engineering Consulting Group, Wuhan, 430074, China

* Corresponding Author: Lingyun Chen. Email: email

TSP_ENERGY_42702.pdf

  • 555

    View

  • 426

    Download

  • 0

    Like

Share Link