Open Access iconOpen Access

ARTICLE

crossmark

Stackelberg Game-Based Optimal Dispatch for PEDF Park and Power Grid Interaction under Multiple Incentive Mechanisms

Weidong Chen1,2,*, Yun Zhao3, Xiaorui Wu1,2, Ziwen Cai3, Min Guo1,2, Yuxin Lu3

1 Integrated Energy Research Institute, Electric Power Research Institute of Guangxi Power Grid Co., Ltd., Nanning, 530023, China
2 Guangxi Key Laboratory of Intelligent Control and Maintenance of Power Equipment, Nanning, 530023, China
3 Institute of Electricity Consumption and Measurement Technology, CSG Electric Power Research Institute, Guangzhou, 510663, China

* Corresponding Author: Weidong Chen. Email: email

TSP_ENERGY_51404.pdf

  • 545

    View

  • 212

    Download

  • 0

    Like

Share Link