Open Access iconOpen Access

ARTICLE

crossmark

Electricity-Carbon Interactive Optimal Dispatch of Multi-Virtual Power Plant Considering Integrated Demand Response

Shiwei Su1,2, Guangyong Hu2, Xianghua Li3, Xin Li2, Wei Xiong2,*

1 Hubei Provincial Key Laboratory of Operation and Control of Cascade Hydropower Station, China Three Gorges University, Yichang, 443002, China
2 College of Electrical Engineering & New Energy, China Three Gorges University, Yichang, 443002, China
3 China Yangtze Power Co., Ltd., Yichang, 443022, China

* Corresponding Author: Wei Xiong. Email: email

TSP_ENERGY_28500.pdf

  • 697

    View

  • 411

    Download

  • 1

    Like

Share Link