Open Access iconOpen Access

ARTICLE

crossmark

Distribution Network Equipment Location and Capacity Planning Method Considering Energy Internet Attribute from the Perspective of Life Cycle Cost

Qiang Li1,*, Lei Xue1, Xia Lin2

1 State Grid Shanxi Electric Power Company Economic and Technical Research Institute, Taiyuan, China
2 State Grid Shanxi Electric Power Company, Taiyuan, China

* Corresponding Author: Qiang Li. Email: email

Energy Engineering 2022, 119(3), 1059-1074. https://doi.org/10.32604/ee.2022.017687

Abstract

For facing the challenges brought by large-scale renewable energy having access to the system and considering the key technologies of energy Internet, it is very necessary to put forward the location method of distribution network equipment and capacity from the perspective of life cycle cost. Compared with the traditional energy network, the equipment capacity problem of energy interconnected distribution network which involves in electricity network, thermal energy network and natural gas network is comprehensively considered in this paper. On this basis, firstly, the operation architecture of energy interconnected distribution network is designed. Secondly, taking the grid connection location and configuration capacity of key equipment in the system as the control variables and the operation cost of system comprehensive planning in the whole life cycle as the goal, the equipment location and capacity optimization model of energy interconnected distribution network is established. Finally, an IEEE 33 bus energy mutual distribution grid system is taken for example analysis, and the improved chaotic particle swarm optimization algorithm is used to solve it. The simulation results show that the method proposed in this paper is suitable for the equipment location and capacity planning of energy interconnected distribution network, and it can effectively improve the social and economic benefits of system operation.

Keywords


Cite This Article

APA Style
Li, Q., Xue, L., Lin, X. (2022). Distribution network equipment location and capacity planning method considering energy internet attribute from the perspective of life cycle cost. Energy Engineering, 119(3), 1059-1074. https://doi.org/10.32604/ee.2022.017687
Vancouver Style
Li Q, Xue L, Lin X. Distribution network equipment location and capacity planning method considering energy internet attribute from the perspective of life cycle cost. Energ Eng. 2022;119(3):1059-1074 https://doi.org/10.32604/ee.2022.017687
IEEE Style
Q. Li, L. Xue, and X. Lin, “Distribution Network Equipment Location and Capacity Planning Method Considering Energy Internet Attribute from the Perspective of Life Cycle Cost,” Energ. Eng., vol. 119, no. 3, pp. 1059-1074, 2022. https://doi.org/10.32604/ee.2022.017687



cc Copyright © 2022 The Author(s). Published by Tech Science Press.
This work is licensed under a Creative Commons Attribution 4.0 International License , which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
  • 1384

    View

  • 738

    Download

  • 0

    Like

Share Link