Open Access iconOpen Access

ARTICLE

crossmark

Energy-Saving Distributed Flexible Job Shop Scheduling Optimization with Dual Resource Constraints Based on Integrated Q-Learning Multi-Objective Grey Wolf Optimizer

Hongliang Zhang1,2, Yi Chen1, Yuteng Zhang1, Gongjie Xu3,*

1 School of Management Science and Engineering, Anhui University of Technology, Ma’anshan, 243032, China
2 Laboratory of Multidisciplinary Management and Control of Complex Systems of Anhui Higher Education Institutes, Anhui University of Technology, Ma’anshan, 243032, China
3 Department of Industrial Engineering, School of Mechanical Engineering, Northwestern Polytechnical University, Xi’an, 710072, China

* Corresponding Author: Gongjie Xu. Email: email

TSP_CMES_49756.pdf

  • 719

    View

  • 368

    Download

  • 1

    Like

Share Link