Open Access iconOpen Access

ARTICLE

Stochastic Programming for Hub Energy Management Considering Uncertainty Using Two-Point Estimate Method and Optimization Algorithm

Ali S. Alghamdi1, Mohana Alanazi2, Abdulaziz Alanazi3, Yazeed Qasaymeh1,*, Muhammad Zubair1,4, Ahmed Bilal Awan5, M. G. B. Ashiq6

1 Department of Electrical Engineering, College of Engineering, Majmaah University, Al-Majmaah, 11952, Saudi Arabia
2 Department of Electrical Engineering, College of Engineering, Jouf University, Sakaka, 72341, Saudi Arabia
3 Department of Electrical Engineering, College of Engineering, Northern Border University, Ar’Ar, 73222, Saudi Arabia
4 Automation and Control Department, College of Engineering Technology, University of Doha for Science and Technology, Doha, 24449, Qatar
5 Department of Electrical and Computer Engineering, College of Engineering and Information Technology, Ajman University, Ajman, 20550, United Arab Emirates
6 Department of Physics, College of Science, Imam Abdulrahman Bin Faisal University, Dammam, 31441, Saudi Arabia

* Corresponding Author: Yazeed Qasaymeh. Email: email

TSP_CMES_29453.pdf

  • 1528

    View

  • 527

    Download

  • 1

    Like

Share Link